replacement of eroded and defective eco lts ltr hts htr its hanger feed coil tubes carrying out d-meter survey erection &dismantling of temporary platforms at bottom ash hopper and wherever necessary conducting dp test for the welded joints in pressure parts and rectification of heavily deformed itsh coil tubes of unit 1 boiler during annual overhaul period for the year 2018-19.